MGF Homepage Banner v3

Providing 40 years’ worth of experience

and specialist knowledge within the construction industry.

Creating safe working environments

No-one goes further than MGF to deliver comprehensive temporary works solutions for excavations and above ground structural support. We deliver this through technical excellence, 40 years of specialist manufacturing experience and absolute commitment to seamless service delivery.


Products

We are proud to design, develop and manufacture our entire range of shoring and structural equipment in-house, including shoring, structural support, trench sheet piles, lifting & safety equipment and pipe stoppers. This allows us to provide in-depth product knowledge, flexibility to meet demand and the ability to undertake bespoke manufacture to meet the most complex of requirements.


Case Studies

MGF supports water pipework infrastructure beneath HS2 line

Using an integrated structural solution to overcome complex challenge underneath HS2.
1

MGF build on existing relationship with Aarsleff Ground Engineering!

MGF and Aarsleff team up to complete job in Forest Town, Mansfield
1000002044

MGF lift the roof at Liverpool Football Club Stadium!

Highly bespoke lifting solution developed using company-wide expertise provided by MGF.
20230527 153755847 iOS

MGF helps set the foundations for 92-home apartment block

Bespoke solution provided efficiently and cost effectively by the MGF team.
Main image 1

News

It’s National Apprenticeship Week!

MGF is celebrating National Apprenticeship Week.
Header

Introducing the NEW GRiPSHORE+ range!

Introducing the NEW GRiPSHORE + range
Header

Introducing MGF’s Technical Sales from our Astley Depot, John Maguire

Introducing Technical Sales, John Maguire.
Header 2

Introducing MGF’s Technical Sales Graduate from our Yorkshire Depot

Introducing Technical Sales, Dean Buffam.
Header 1

“Organisations that gain recognition for their health and safety management systems such as MGF Trench Construction, contribute to a collective raising of the bar for other organisations to aspire to.”

David Rawlins, RoSPA

“MGF’s 3D modelling proved to be an invaluable tool in conveying the complexity of the project leading to a value engineered, achievable final solution for the temporary works element.”

John Croxford, Getjar Limited
ACCREDITATIONS gallery 08.22