graphic

Building on existing relationship with Aarsleff Ground Engineering!

WORKING WITH AARSLEFF GROUND ENGINEERING

In October 2023, MGF supported Aarsleff Ground Engineering on a project in Forest Town, Mansfield. The project was to upgrade the wastewater facilities in the village and Aarsleff Ground Engineering’s role was to install a temporary sheet piled cofferdam to allow excavations to take place.

The collaboration between MGF and Aarsleff has been ongoing for many years. The combination of MGF’s innovative product design and Aarsleff’s operational expertise means that value-added solutions can be offered to help save on time, cost, and associated emissions.

PROJECT

Forest Town, Mansfield

Contractor

Aarsleff Ground Engineering

Project Lead

Chris Whitworth, Business Development Director

KEY BENEFIT

Utilising MGF’s modular system, provided a quicker installation time and sustainability advantages, when compared to if a welded frame solution had been used.

THE SOLUTION

In total, MGF provided 246 sheet piles over a total programme of two weeks. and 5 200 series cross struts to support installation of a full 254UC tank brace system. Due to tough ground conditions, Aarsleff quickly addressed the issue by pre-auguring to loosen the material to minimise delays. The solution installed was a cofferdam.

This excavation creates a dry working environment for the major work to proceed. At Mansfield, this will be the installation of attenuation tanks.

MGF also supplied 5 200 series cross struts to support installation of a full 254UC tank brace system. Temporary hydraulic frames and struts are seen as being a viable reusable alternative.

THE VERDICT

As the MGF system is a reusable fleet hire option, the system provided sustainability advantages to Aarsleff’s client when compared with traditional welded waler systems.

The fully modular system also resulted in a speedier installation compared to if a welded frame solution had been used. MGF were proud to support another successful project and look forward to the continued relationship with Aarsleff.

We, together with MGF, have a shared vision of innovation and sustainability, which we strive to implement from the outset. In turn, this enables us to provide pioneering and cost-effective solutions. The collaboration between everyone involved with the project ran smoothly and we are pleased to have offered a value- added solution to our clients once again.
Project Manager
Aarsleff Ground Engineering

Related Products

GU Sheet Piles

Sheet Piles – GU 23N (S390GP)

Interlocking steel sheet piles form a high strength sheeting system, ideal for supporting the vertical faces of large excavations. U-Type …

200 series struts

200 Series Strut

A highly versatile, medium duty strut system primarily for use in conjunction with hydraulic bracing systems. For use with 600kN …

254UC Brace product image

254 UC Brace

Designed to brace medium to large cofferdams and trenches, allowing safe installation of large underground structures, deeper drive/thrust pits or …

Get in touch

Whether you have a question, need a quote, or want to discuss a project, our dedicated team is ready to assist you.

Search...