MGF PROVIDES SOLUTION FOR INDOOR LIFTING OPERATION
Working on behalf of Budweiser Brewing Group, this project for an indoor lifting operation on the outskirts of Preston was one that needed to be actioned immediately.
Workers in the factory needed regulated temperatures to create a safe working environment. They needed to install a new 5m long air cooler unit in the factory.
However, T.E.P. Machinery faced a problem – they had limited headroom inside the factory.
The restriction of conducting a lifting operation indoors meant they required a unique solution with a single-point lifting attachment.

PROJECT
Budweiser Brewing Group Factory
Contractor
T.E.P. Machinery Movement Ltd
Project Lead
Nick Mcgregor, Technical Sales Lifting & Safety
KEY BENEFIT
Fast and efficient turnaround time for the project
THE SOLUTION
Having seen MGF’s lifting capabilities online, T.E.P. Machinery knew that our capabilities could help them quickly complete this project.
When approached to provide a proposition for the project, MGF immediately started exploring the best solution from our heavy lifting range.
We discussed the possible utilisation of each of our heavy lifting products before concluding that one of our lifting beams would be best suited to this project.
Having looked at the drawing of the 5m long AC unit provided by the client, we concluded that the AL15 would best be suited for this project, being attached via eight points.
The AL15 Adjustable Lifting Beam was chosen, as it is perfect for lifting operations where there is limited headroom.


THE VERDICT
Started in March 2025, this project is currently ongoing, with the lifting operation due to take place in April of the same year.
MGF quickly provided the necessary kit to conduct a quick, safe and efficient lifting operation without causing interruption inside the factory.
After a smooth and successful lifting operation, T.EP. Machinery are already looking forward to collaborating with MGF on their next lifting project.