To supply low-carbon heat to buildings across Bristol, CP Groundworks were tasked with installing a district heating main directly through Temple Meads, which would be achieved with a 78m long open excavation.

MGF’s involvement on the district heating main came through CP Groundworks who introduced MGF to Eurovia.

PROJECT

Installation of a district heating main in Temple Meads

Contractor

CP Groundworks

KEY BENEFIT

Varied bracing system installed to coincide with planned service crossings

THE SOLUTION

Contact for the Eurovia contract was initiated by an MGF Technical Sales Representative, who delivered two presentations on MGF’s capabilities, products and services. MGF’s Regional Engineer, Richard Lawrenson, joined for a third presentation on our engineering capability to employees of both contractor and client.

A completely open, 78m long excavation was required for installers to connect and weld the DHM pre-made pipe, with plotted bell hole positions to allow access to join sections together.

In order to avoid historical features, the excavation had to follow a critical path – bypassing the port wall, Temple Meads train station and many live service lines.

MGF’s design utilised a varied bracing system to coincide with planned service crossings during the excavation. We provided Manhole, 152UC and 203UC Braces to meet the requirements of maximum space and accommodate the install of 12m sections of pipe.

78m Long Open Excavation 2
78m Long Open Excavation 3

THE VERDICT ON THE A533 EXPRESSWAY BRIDGE REPLACEMENT

The works involved a network of underground pipes – connected to a number of

energy centres, including biomass boilers and gas combined heat and power (CHP) plants.

Related Products

203 product image

203 UC Brace

Designed to brace small to medium sized cofferdams as well as larger trenches, this system allows for the safe installation …

Manhole Brace Product Image

Manhole Brace

The simple to assemble, four-sided hydraulic frame system has been designed to brace small cofferdams and ensure the safe construction …

152UC Waler view 3

152UC Waler

Assembled weight includes 2 No. 250kN Hydraulic Struts …

Get in touch

Whether you have a question, need a quote, or want to discuss a project, our dedicated team is ready to assist you.

Search...