MGF Supports Water Pipework Infrastructure Beneath HS2 Line

SUPPORTING PIPEWORK BENEATH HS2 LINE HS2 will be the UK’s zero-carbon, high-speed railway, which has been taking shape for the last three years. This major initiative is the largest ever rail investment to have been made in the UK and the biggest infrastructure project in Europe. MGF’s dedicated Rail/HS2 Team who are on hand to […]
MGF Assist with the UK’s Largest Ever Bridge Move!

MGF ASSIST WITH THE UK’S LARGEST EVER BRIDGE MOVE In Ravenscraig, Scotland, MGF supplied equipment that assisted in the installation of a 5,000-tonne bridge move, as part of an investment into the rejuvenation of the Ravenscraig Steelworks site by North Lanarkshire Council. The job required closing the railway for 9 days over the Easter weekend […]
The Restoration and Repair of Adam Bridge, Marchmont Estate

THE RESTORATION AND REPAIR OF ADAM BRIDGE Smith & Garratt reached out to MGF to restore Adam Bridge after seeing the success of a previous project. The bridge received a Grade B listing by Historic Environment Scotland. Built in the mid-1700s, the bridge has deteriorated because of weathering and time. The contract with MGF helped […]
Lincoln Eastern Bypass

A533 EXPRESSWAY BRIDGE REPLACEMENT Following the collapse of Carillion, Galliford Try were appointed to build a 7.5km single carriageway road that would form a new bypass on the eastern side of Lincoln – known as the Lincoln Eastern Bypass. When complete, the new road will connect the A15 with the A158, relieving congestion by up […]
A533 Expressway Bridge Replacement

A533 EXPRESSWAY BRIDGE REPLACEMENT Works commenced on the a533 Expressway Bridge Replacement project took place in January 2022. The purpose of National Highways’ scheme was to replace the concrete bridge with a new 67m two-span concrete bridge. To minimise disruption, the existing bridge will remain open whilst the new bridge is constructed offline. Upon completion […]
M6 Junction 10 Improvement Works

M6 JUNCTION 10 IMPROVEMENT WORKS The M6 junction 10 is well known for its congestion and traffic delays during peak times, which affects the local communities within the West Midlands and wider region. To reduce these issues, improvements to the junction and adjoining roads – A454 Wolverhampton Road, Bloxwich Lane, A454 Black Country Route and […]
MGF Aid Kiernan Construction with Tank Installation

MGF AID WITH TANK INSTALLATION Construction of a new 94-acre business park near Darlington required tank installation of three large below ground tanks, one of which necessitated the use of MGF’s T700 brace. Following Kiernan’s successful tender to complete the construction of the tanks, MGF were soon engaged to discuss and develop suitable, efficient temporary […]
Upgrade of drainage works at Bletchley MDU

UPGRADE OF DRAINAGE WORKS AT BLETCHLEY MDU As part of the expansion of Network Rail’s depot at Bletchley, installation of a new septic tank for the sewerage system was required. After being directly engaged to the project by Jamieson Contracting, MGF’s Rail Sales Specialist met with the Jamieson and Network Rail teams both virtually and […]
London Underground Sheet-Piled Cofferdam

LONDON UNDERGROUND SHEET-PILED COFFERDAM As part of the extensive, ongoing power upgrade of the London Underground (Package 4), MGF had been selected by Bam Nuttall to assist in designing a support system for the construction of a reinforced concrete substructure on Chapel Road. MGF’s scope was to design and supply a structurally efficient temporary works propping scheme whilst not […]
Rail Electrification of the Chase Line

RAIL ELECTRIFICATION OF THE CHASE LINE As part of the extensive chase line electrification works between Rugeley and Walsall, an Under Track Crossing (UTX) was constructed at Bescot to accommodate a duct route for cables between cess catchpits at either side of the two lines of track. The scheme involved erecting overhead wires on 51km […]