graphic

RAIL & HS2

At MGF, we provide engineered temporary works solutions to support our customers to deliver rail infrastructure and maintenance programmes.

MGF provides specialist temporary works solutions to support the safe and efficient delivery of rail and high-speed rail projects across the UK. From excavation safety and structural support to lifting and safety systems, our engineered solutions are designed to meet the complex demands of the rail environment.

At MGF, we understand the unique challenges of working within the rail sector. Our dedicated Rail & HS2 team brings hands-on industry experience, with every member fully PTS-qualified and supported by our RISQS accreditation. This specialist knowledge means we understand the demands of working trackside and within complex infrastructure environments. 

Our offering includes:

  • Excavation support for earthworks, drainage, and utility installations
  • Structural systems for bridges, platforms, and station upgrades
  • Lifting and safety solutions for electrification, signalling, and power upgrades
  • Bespoke GRP systems for UTX/URX installations – lightweight and non-conductive
  • Track drainage, foundations, and rolling-stock depot support
  • Large stockholding of sheet piles for sale or hire
 Whether it’s early-stage design input or on-site technical support, our team is on hand to deliver practical, compliant solutions that keep your project moving safely and efficiently.

Explore the ways we help deliver essential social infrastructure through tailored temporary works solutions, designed to meet the needs of the communities they serve:

Engineering Excellence for Complex Rail Environments

MGF’s Rail & HS2 design team includes Form C and CRE(D) capability, ensuring full compliance with Network Rail standards.

Our Rail Engagement Engineering Policy outlines our procedures for design and check certification in line with industry expectations.

Our innovative product range includes GRiPSHORE™, a lightweight, non-conductive shoring system ideal for shallow, confined excavations in electrified environments, minimising risk while maximising efficiency.

quote
quote
The kit [GRiPSHORE] is simple to set up and use, requiring a short training session which MGF provided as part of the whole package. Network Rail’s onsite engineer was equally impressed with the system, given its speed and ease of use.
Justin Lewis - Contractor Responsible Engineer (Track)
Our Accreditations & memberships
PROJECTS WE HAVE SUPPORTED

Explore our case studies to discover how we’ve helped customers overcome challenges with innovative solutions.

Leadenhall Street
corner

Gotham City shines a new light on Leadenhall Street

Excavation Support for St Michael's
corner

Excavation Support for St Michael’s

MGF's Continued Support To Flood Defences
corner

MGF’s Continued Support To Flood Defences

MGF Provides Solution for Indoor Lifting Operation
corner

MGF Provides Solution for Indoor Lifting Operation

Get in touch

Whether you have a question, need a quote, or want to discuss a project, our dedicated team is ready to assist you.

Search...