Innovative Basement & Lift Shaft Support for the Turing House Project

Innovative Basement & Lift Shaft Support for the Turing House Project

MGF collaborated with Chartrange Limited on behalf of Barclays to support the construction of a new below ground basement and lift shaft extension in Knutsford.

Working closely with Chartrange’s temporary works design team we provided specialist guidance which ensured the correct equipment was selected for the 6M deep excavation. To meet the project’s structural requirements, MGF modified our frames and fabricated bespoke shear stop, while also delivering specialist sheet piles at short notice to meet our customers requirements.

This approach enabled Chartrange to progress the basement works in the allotted timescale required.

PROJECT

Supporting the construction of a below ground basement and lift shaft extension 

Contractor

Chartrange Limited

KEY BENEFIT

The project required modified frames and custom fabricated shear stops

THE SOLUTION

After a detailed assessment of the project requirements alongside Chartange Limited’s team, it was identified that the most suitable solution was to use a combination of our above ground and below ground shoring support system to ensure the four-story building was safely supported.

To achieve this, MGF supplied sheet piles/frame solutions alongside our propping arrangement using UniShore®, to create a robust structural support system capable of accommodating the buildings load throughout the basement and lift shaft excavation works.

THE VERDICT

The project was excellently planned and executed, from the initial design process through to the safe installation and final removal of all temporary works equipment. This approach ensured that all clients requirements were met and enabled the works to progress efficiently and without delay.

Our client at Chartrange praised the level of support throughout and said: “From the start and throughout the design stages, the MGF team were more than happy to assist with amendments where required. From the programming of delivery of the subnational amount of kit, they were great.”

Their feedback reflects the effectiveness of our engineered temporary works solutions and the consistent support delivered throughout the project. 

Related Products

18t Hybrid Culvert Puller

The 18t Hybrid Culvert Puller is a mechanical device designed for the fast and safe method of installing pre-cast concrete …

Culvert Puller Anchor

Designed for use with culverts ranging from 0.6m to 1.2m internal height, the Culvert Puller Anchor provides a secure pulling …

MasterLink Trolley

MasterLink Trolley

Our MasterLink Trolley can be used when additional headroom or clearance is not an issue and the convenience of a …

Get in touch