MGF Provides Solution for Indoor Lifting Operation

MGF Provides Solution for Indoor Lifting Operation

MGF PROVIDES SOLUTION FOR INDOOR LIFTING OPERATION Working on behalf of Budweiser Brewing Group, this project for an indoor lifting operation on the outskirts of Preston was one that needed to be actioned immediately. Workers in the factory needed regulated temperatures to create a safe working environment. They needed to install a new 5m long […]

Innovative 32-Tonne PCS Unit Lift for MGF and Keltbray Lifting

Innovative 32-Tonne PCS Unit Lift for MGF and Keltbray Lifting

INNOVATIVE 32-TONNE PCS UNIT LIFT In 2024, MGF were tasked with providing a PCS unit lift solution for what posed to be a unique challenge. Located at Richborough Energy Park, the project was to lift PCS units (Power Conversion System Units) that had been transported to the site into place at the energy park. The […]

Supporting the Gas Network’s Largest Gas Upgrade

Supporting the the gas network’s largest gas upgrade

GAS NETWORK’S LARGEST GAS UPGRADE Murphy Group were asked to take on an upgrade project at Peterborough Gas Compressor Station as part of a major capital delivery programme, which is responsible for constructing most of the National Grid’s gas and electricity transmission assets. The programme will see National Grid replace or upgrade a series of […]

Gas Main Diversion at A14 Dual Carriageway

A14 Dual Carriageway

GAS MAIN DIVERSION AT A14 DUAL CARRIAGEWAY Excavation works began in 2017 for the construction of a thrust wall to Auger Bore, to allow for the diversion of a gas main on Highways England’s £1.5billion A14 Dual Carriageway Cambridge to Huntingdon Improvement Scheme. This project includes both road widening and construction of a new stretch of […]

River Humber Pipeline Replacement

River Humber Pipeline Replacement

RIVER HUMBER PIPELINE REPLACEMENT The River Humber pipeline replacement is an important pipeline – connecting an import location for gas at Easington, on the East Yorkshire coast, to the national network – delivering gas supplies to millions of households throughout the UK. Feeder 9, the original pipeline, is buried in a cut-and-cover trench under the […]

MGF On The North Scotland Coast!

MGF On The North Scotland Coast

MGF ON THE NORTH SCOTLAND COAST To facilitate the installation of a new offshore wind farm, three cofferdams were required on the North Scotland Coast to form transition joint bays, connecting offshore and onshore cables together. An open span excavation was critical to the project to provide sufficient working room to complete the cable jointing […]

78m Long Open Excavation

78m Long Open Excavation

78M LONG OPEN EXCAVATION To supply low-carbon heat to buildings across Bristol, CP Groundworks were tasked with installing a district heating main directly through Temple Meads, which would be achieved with a 78m long open excavation. MGF’s involvement on the district heating main came through CP Groundworks who introduced MGF to Eurovia. PROJECT Installation of […]

Waste Bunker at Earls Gate Energy Centre

Waste Bunker at Earls Gate Energy Centre

WASTE BUNKER AT EARLS GATE ENERGY CENTRE Assistance was required at a waste bunker at Earls Gate Energy Centre in Grangemouth, Scotland, to provide temporary support for safe access to complete ongoing progress. MGF became involved with the project after meeting with the contractor, Clugston Construction. Discussions took place surrounding the initial design and how […]